Design to Working Loads
Storm Water

A range of Rational Method formats is supported to design networks to pipe full conditions. Any shaped section may be analysed. Results are updated on input with instant feedback. Typically pipes are designed to accommodate return periods of between 1 and 5 years.
Foul (Sanitary) Water
Main drainage design methods and discharge unit methods (EN752) are supported for domestic, industrial and process drainage. The procedure for foul (sanitary) drainage design is similar to storm drainage.
© 2011 Micro Drainage Limited. Web Design and Development by Samui Design