Phase 7 - And Beyond
3D World View
Flood Flow Paths
And Beyond (2 of 2 pages)

It is also important that the engineer thinks beyond the design specification of the system e.g. no flooding for 30 year RP. Failure modes must be examined. A system that is OK for a 30 year RP storm but fails catastrophically for 30 years RP + 5% is an unsatisfactory design. In the event of failure flood flow paths should be illustrated. Sensitivity analysis is made simple with APT.
All these functions, together with audit facilities, are provided in the Advanced Productivity Tools. Hundreds of scenarios may be simulated in one run and their impacts summarised in clear reports with critical analysis.